Services
How we work with teams turning an assessment into action
Four formats — pick the one that fits where you are. Real prices, no contact-us-for-quote. Sign in to see the full scope, deliverables, and what we won't do.
Facilitated workshop — 5 to 10 people
Half-day session where your leadership retakes the assessment together and walks out with a single aligned roadmap.
- Duration
- Half-day (4 hours)
- For
- 5–10 leaders plus the team's digital lead
- Strategy
Diagnostic engagement — 2 weeks
Two weeks of A4BEE consultants validating your scores via interviews and artifact review, then handing you a 90-day plan to move up one full maturity band.
- Duration
- 10 working days
- For
- Sponsor + 6–10 interview targets across leadership and operations
- Strategy
- Governance
AI Production Readiness Audit
You've built an AI prototype. Maybe with a consultancy, maybe in-house, maybe through an A4BEE Jumpstart. Two weeks tells you whether it's actually ready to run unsupervised in regulated production — and what it would cost to close the gap.
- Duration
- 2 weeks
- For
- Orgs with an existing AI deployment (prototype or production) who need an independent read on whether it's ready for regulated-industry production — or what it'll cost to get there
- Biotech
- Pharma
- Manufacturing
- AI
- Governance
- Strategy
Enabling eBR — blueprint engagement
Six-week joint engagement that turns the eBR ambition into a defensible plan: AS-IS audit, TO-BE process model, technical architecture, and a sequenced implementation roadmap. Planning only — no code, no validation, no deployment.
- Duration
- 6 weeks (1 remote + 1 onsite workshop + 4 design/roadmap)
- For
- Sponsor + process, quality, IT/OT, and manufacturing leads
- Pharma
- Biotech
- Manufacturing
- Strategy
Digitizing tech transfer — blueprint engagement
Six-week joint engagement that turns the tech-transfer ambition into a defensible plan: AS-IS audit, TO-BE process model, technical architecture, and a sequenced implementation roadmap. Planning only — no platform built, no integrations shipped.
- Duration
- 6 weeks (1 remote + 1 onsite workshop + 4 design/roadmap)
- For
- R&D lead + manufacturing lead + IT/data lead + transfer programme sponsor
- Pharma
- Biotech
- Manufacturing
- Strategy
Digitizing CPV — blueprint engagement
Four-week jumpstart that turns the Continued Process Verification ambition into a defensible plan: AS-IS audit, requirements, initial technical architecture, and a prioritized roadmap. Open-source-first by default — no long vendor selection, no procurement detour, no lock-in.
- Duration
- 4 weeks (1 remote + 1 onsite workshop + 2 design/roadmap)
- For
- Sponsor + process / QA / data engineering leads on the manufacturing or biotech side
- Pharma
- Biotech
- Manufacturing
- Strategy
Enabling Data Platform — blueprint engagement
Six-week blueprint that turns the data-platform ambition into a defensible plan: AS-IS audit of data sources + systems, target 10-domain enterprise architecture, open-source-first stack, six-workstream project plan, and a sequenced roadmap. Planning only — no code, no platform stood up.
- Duration
- 6 weeks (1 remote + 1 onsite workshop + 4 design/roadmap)
- For
- Sponsor + IT, data engineering, ops, and QA leads on the biotech / pharma / manufacturing side
- Biotech
- Pharma
- Manufacturing
- Data
- Strategy
- Governance
Advisory retainer — monthly cadence
An A4BEE advisor inside your transformation — monthly working sessions, async access between, quarterly reassessment.
- Duration
- Rolling — 6-month minimum, month-to-month after
- For
- Transformation sponsor + the team(s) actually doing the work
- Strategy